国产又粗又大又长-国产成年无码久久久久毛片-强h辣文肉各种姿势h在线视频-中字幕视频在线永久在线观看免费-少妇人妻88久久中文字幕-中文天堂在线视频-色综合av在线-激情成人av-久久亚洲精品无码va大香大香-久久久视频在线-欧美a级大胆视频-91精品啪在线观看国产-亚洲综合色婷婷在线观看-精品少妇人妻av免费久久洗澡-亚洲专区第一页-伊人激情-在线免费观看www-99久久免费看视频-亚洲经典三级-国产热99

 
         
    Home Contact us 中文版
Home About us News Products Honors Feedback Contact us  
     Wellhead
     X-mas Tree
     valve
     Tube remit
     bop
     Casting products
     reducer
     Safety valve
 
 
 
YANCHENG SHENHUA MACHINERY MANUFACTURE CO.,LTD
Add:No. 1299, Jianhu Avenue South Road, Jianhu County
Tel:+86-515-86500588
    86500699
Fax:+86-515-86500599
    86500699
zip:224761
Email:zxw@ycshenhua.com
You are the location  >> Shenghua Machinaty manufacture Co.,Ltd >> Product    
 
   
  Ground control assembly Detailed parameter  
      During the  cause  of  test , fluid  should  be  controllably  guided  into  separator  and  burner  after  flowing  through  drilling  rod  or  tubing , the  assembly  is  named  as  control  assembly , which  can  control  the  pressure  and  flow-rate  of  the  pressure  and  flow-rate  of  the  fluid  safely  and  effectively .
1 .Control  head
  Jointed  with  the  upper  of  the  test  string . Control  head  is  classified  into  rotary  head  and  un -rotary  head  of  two  kinds , and  also  into  three  kinds  of  35MPa , 70MPa  and  105MPa  according  to  the  bearing  pressure , and  it  can  let the  high -pressure  fluid  flow  out  of  string , but  also  pump  fluid  into  well .
   2 .Rigid   manifold
      Used  to  control  fluid  pressure  and  flow-rate . Rigid  manifold  is  joined  with  control  head  upwards  and  connected  with  separator  and  blowout  pipeline  downwards .
      The  working  pressure  includes  35MPa , 70MPa  and  105MPa  with  appropriate  test  pressure  of  70MPa , 105MPa  and  140MPa .
3 .Active  manifold
   Used  to  joint  the  control  head , manifold  and  blowout  pipeline , the  manifold  of  special  EUE  seamless  steel  pipeline  union and  active  elbow .
   The  working  pressure   includes  35MPa , 70MPaand  105MPa  with  appropriate  test  pressure  of  70MPa , 105Ma  and  140MPA .
The  manifold  should  be  regularly  inspected  and  lubricated . Sealing  ring  should  be  replaced  and  sealing  tested  to  ensure  safety  in  test .

 
 
Home | About us | News | Products | Honors | Feedback | Contact us 
COPYRIGHT[C]2011 YANCHENG SHENHUA    ALL RIGHTS RESERVES